How Interior Design Firms Can Prepare a Trade Scope

·

What a contractor needs before quoting: drawings, finishes, site access, and a clear list of trades.

A contractor can quote more clearly when the design is already decided. Share the approved layout, relevant elevations, a finishes schedule, and a list of the trades you want executed — electrical, plumbing, tiling, painting, carpentry installation, glass, waterproofing, and so on.

Include site facts that drawings do not always show: property type, floor, access hours, loading, protection requirements, and whether the unit is occupied. Flag items that are still pending client confirmation so they are not priced as if they were fixed.

Separate design intent from execution. You remain the design lead. SteadyReno reviews the approved scope, discusses site realities, and carries out the agreed works through installation, finishing, and rectification. White-label or exclusive arrangements are discussion points, not assumptions.

Send the pack through the trade project form or to info@steadyreno.com. A short call can follow if the drawings need a walkthrough. Quotations follow the documents you provide; missing information is requested before numbers are treated as final.

This note is a planning aid. It is not legal, HDB, BCA, or permit advice.